1. 通宝棋牌-【官网首页】
  2. Investors
  3. Upstream major projects
  4. 2019 Upstream major projects
  5. Angelin, Trinidad

Angelin, Trinidad

Completed:
26 February 2019
~60 mboed peak annual average production, net to BP
The Angelin project develops four wells and features the construction of a new platform 40 miles off the southeast coast of Trinidad in water-depth of approximately 215 feet. Gas from Angelin flows to the Serrette platform hub via a new 13-mile pipeline.
Location Trinidad
Operator BP
Partners 100% owned by BP Trinidad and Tobago which is owned by BP (70%) and Repsol (30%)
Project type LNG
Peak annual average production
~60 mboed (gross)
~60 mboed (net)
Angelin
Angelin
Angelin
Angelin
Angelin
Angelin
Angelin
Angelin
Angelin
Angelin
Angelin
Angelin
Angelin
Angelin